45% complete

I’m nearly at the halfway point. Hopefully the TEN TO TWELVE HOURS I have to spend on the train in the next two days will help me get that much closer to 100%. The picture is just after the second straight section, but I’ve now finished 5.5 straight sections.
I am not sure, but my tension changed a bit the other day when I was sat up in bed knitting versus on the couch. I was having a terrible backache so I propped myself up and kept knitting. The stitches I did are much looser. But that could also be because I was on some mild pain killer and was perhaps a little more out of it than I realised hahaha.
I am taking other knitting projects with me for the long train journey. The Charade socks, which are getting closer to being 100%, and an unnamed project as I’m not sure yet.
Oh! The cardigan is done! Washed and blocked and ready to go. I was going to wear it to work today, but didn’t. I need to sort out something to keep it closed since I opted for no button holes. This was, of course, intentional as I want to use a stick of some sort. I dunno. We’ll see how it works out. Anyway, Noro Silk Garden is a bit scratchy when you work with it, but my-oh-my how it softened up with a warm water soak and some rose and mandarin organic hair conditioner (thanks Prince Charles!). I’ll take it with me to California next week so will get pictures there since there’s never any light here these days.
Oh, and I bought some destash yarn from another raveler. It’s not quite the colours I thought so I’m a bit disappointed. I’ll have to take some photos to see if anyone else might like it. It’s not horrible, but not as dusty as I thought. I dunno, maybe in some daylight it will look better, but again, NO LIGHT.
Right, I’m off to bed rather early for once as there’s no snoozing tomorrow morning since I’ve got a taxi and train booked.
TrackBack
TrackBack URL for this entry:
http://www.librarygirl.co.uk/knits/2007/11/12/45-complete/trackback/